Print Message

   RE: Original Material Cost Reporting to GC for AZ5005 when MRRA
 From: Diane Travis
 To: Valley of the Sun, Phoenix, AZ
 Posted: 04-14-2016 10:52
 Message:

We have our subcontractors break their billing out between labor and materials on MRRA projects.

D.

 

Diane Travis, CBT

Controller

Haley Construction Co

302 W. Willis, Suite 101

Prescott, AZ 86301

928-445-1281

928-227-1546 fax

 



------Original Message------

Could someone help me to better understand how GC’s are handling reporting actual costs for sales tax purposes on a monthly basis on MRRA projects where the GC has provided an AZ5005 from to their subs?

Do GC’s providing an AZ5005 on MRRA projects have a way of accurately reporting/remitting sales tax on the sub's materials without needing to request actual costs from their subs?

------------------------------
Aaron Tingwald CCIFP
Assistant Controller
Wilson Electric Services Corp.
Tempe AZ
(480) 505-6657
------------------------------

Copyright © All rights reserved.